That week in Atlanta where everything went right on a commercial floor job
I had this one week back in 2017, working on a small office lobby in Atlanta, and it was just unreal how smooth it went. The subfloor was actually level on the first check, which never happens, and the LVP we were installing had this click-lock system that just worked without any fuss. I think we laid down about 800 square feet in two days, and the pattern we did with the planks came out looking like it was factory designed. The client walked through on Thursday, said "this is exactly what I pictured," and cut me the final check right then. I still think about that job sometimes when I'm fighting with a bad glue batch or a saw that won't stay square. Has anyone else had a job where the stars just aligned like that?