Switched to a 3 flute end mill on 6061 and my cycle time dropped 40 seconds
I run a Haas VF-2 in Spokane and had been fighting chatter on a pocket job for weeks, so last Tuesday I finally tried a 3 flute carbide instead of the 2 flute I always grab. My cycle time went from 4 minutes 20 down to 3:40 and the finish came out clean enough that I skipped a second pass. I figured 3 flute was only for guys running production all day, but on aluminum it just moves chips out better and I stopped recutting them. Still dialing in feeds though, so if anyone runs 3 flute on 6061 in smaller shops, what rpm and chipload are you running?