TIL a stretch job at a motel in Reno changed how I lay tack strip
I was pulling up 30-year-old carpet at a roadside motel in Reno last month and noticed the original crew gouged the concrete every 6 inches, which let the strip sit dead flat on a slab that was way out of level. I used to shim and nail through everything, but now I grind the high spots instead, and the pull comes out tighter. Anybody else swear by grinding over shimming on slab work?