Walked into a half framed wall in Fresno and my chalk line was 4 inches off the whole run
So last week I'm framing a wall for a guy's shop out in Fresno, real simple job, 24 feet, nothing fancy. I snapped my chalk line off a corner and just started cutting studs, didn't double check nothing. Got about halfway framed and noticed the top plate was hanging over the slab edge by a mile. Turns out a buddy had bumped my tape while we were laying out and I never re-marked. Took me 20 minutes with a sledge to knock it apart and start over. Now I check the line with a framing square at both ends before I cut a single stud. What do you all do to keep your layout honest when there's two people working the same wall?