Heard a guy on a ladder at a job in Toledo say he labels both ends before he pulls, and now I do it too
I used to just label the far end and figure I'd remember which run was which at the panel, which bit me on a 14 drop house last month when two bedrooms came back swapped. Now I throw a piece of tape with the room name on both ends before the pull, costs me maybe 20 extra seconds per run. Anybody got a system for keeping the labels straight once they're all bundled at the box?