Finally cracked the 20 minute mark on a single family rough-in in Boise last Tuesday
Three years ago I was taking almost two hours to rough in a basic 2,000 sq ft house, and it bugged me every single day. Last Tuesday in Boise I clocked 19 minutes and change from the first hole to the last staple, and I honestly just sat in the truck for a minute after. The thing that got me there was pre-cutting all my drops at the curb before I ever walk in, plus running the drill off my hip instead of setting it down every time. I also quit fighting the corners and started dropping my plate holes first, then pulling toward them. It sounds dumb but shaving 90 minutes off a rough-in means I can actually take a lunch break now. What's your best time on a standard two story, and what part slows you down the most?