Tried a mortar mixer instead of the paddle on a 12 ft wall in Billings and got a weird result
Last week I had a small job in Billings, just a 12 ft garden wall, and decided to rent a mortar mixer instead of my usual paddle and bucket. The mix came out way wetter than I expected, almost soupy, and I nearly dumped it before I realized the blades were pushing the water to the bottom. I let it run another 90 seconds and it evened out fine, but the first three batches were off by a good half gallon of water. What I learned is the mixer needs way less water up front than the paddle does. Has anyone else had to cut their water back after switching to a drum mixer, and by how much?