Warning: a lead tech in Columbus called my panel layout "a maze for ants" and I reworked everything
Back in 2019 I was running cable fast and cramming everything into the top left corner of the can, and I figured it was fine since it all worked. Then a lead tech on a Columbus job popped the cover, looked at it for maybe ten seconds, and asked if I wanted the next guy to trace that mess at 2am with a flashlight. I started labeling every zone wire with a wrap of tape and a sharpie, and I left the terminals spaced out so a tester can clip on without pulling anything loose. Now my panels take maybe 15 extra minutes but the callback walks go way smoother. Anyone else get called out like that, and what did you change first?